Wall and ceiling dimensions in, sheet and waste assumptions applied, board count out. Updates as you type.
Gross wall area = (W1+W2+W3+W4) × wall_heightCeiling area = ceiling_length × ceiling_width (only when Include ceiling is checked)Openings deduction = doors × 21 sf + windows × 15 sf (standard 3×7 door, typical residential window)Net area = max(wall + ceiling − deductions, 0)Sheets = ceil(net_area × (1 + waste) / sheet_sf)Screws = sheets × (32 for 4×8, 40 for 4×10, 48 for 4×12) (16" OC framing: 8 perimeter + 24 field on a 4×8)Tape = 370 LF per 1,000 sf of net area × (1000 sf) (USG/NGC typical for Level 3)Joint compound = 0.053 gal/sf × net_area (USG readymix Level 3 baseline, ~3 coats)Corner bead = override if > 0, else 8 × wall_height (8 outside corners assumed)