Area and finish level in. Tape LF, ready-mix gallons, buckets, hot mud, and material dollars out. Bazooka discount toggle.
| Finish | Tape LF / 1,000 sf | Mud gal / sf |
|---|---|---|
| L1 fire-tape | 220 | 0.018 |
| L2 | 280 | 0.030 |
| L3 | 370 | 0.053 |
| L4 | 400 | 0.065 |
| L5 (skim) | 400 | 0.090 |
Tape LF = area × tape_rate / 1000 × tool_factor (tool_factor = 0.92 for bazooka, 1.00 manual)Tape rolls = ceil(tape_LF / 500)Mud gal = area × gal_rate (L5 used whenever skim checkbox is on)Buckets = ceil(mud_gal / 5)Setting compound = 0.20 × mud_gal for L4 & L5, else 0Cost = rolls × $roll + mud_gal × $gal + hot_gal × $hot